Source: https://guthlabs.ai/docs/project-templates/experiment-run/deadlines/

project template / candidate

# Experiment run — deadlines

The distinct deadlines record for Experiment run. This page is proposal-only.

Status: **proposed**Lifecycle: **candidate**

## Record status

**Record ID**: project:experiment-run

**Parent lifecycle**: candidate

**Page lane**: app_features

**Lane lifecycle**: proposed

**Owner**: Not separately recorded

**Owner role**: Not separately recorded

**Owner status**: Not separately recorded

**Qualification result**: NOT RUN · held for evidence and human review

**Working browser surface:** [Project templates & workflows — overview](<https://guthlabs.ai/labs.html#templates-workflows>) — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.

## Deadline and workback rules

- A decision deadline is required before the project can leave intake planning.

- Every milestone must have an owner, planned finish date, output, and acceptance condition.

- The final evidence deadline must precede interpretation approval by at least one review interval recorded in the project.

- The last allowable run date must precede the final evidence deadline and include an explicit buffer.

- A dependency marked blocking must have a due date, owner, readiness evidence, and fallback or escalation path.

- Overdue items remain open until a person records completion, revised date, or held status; no automatic completion is implied.

- Any protocol change after the first completed run requires a new protocol revision and approval before affected runs are interpreted.

- Closure is blocked while required approvals, run dispositions, evidence review, or critical risks remain unresolved.

- Target run date is optional until supplied; no inferred date may be displayed as a commitment.

- When a target run date exists, generate local draft tasks for protocol freeze, fixture readiness, materials readiness, review, analysis, and receipt completion.

- Reject or visibly flag workback dates that fall after their dependent deadline.

- Show timezone and whether a deadline is planned, overdue, completed, or held.

- Recurring tasks remain candidates until a human confirms recurrence.

- Changing the target date creates a revision and preserves prior workback tasks rather than silently moving completed tasks.

- External calendar writes, reminders, messages, and notifications remain held.

## Workback sequence

- Create the experiment-run project record and assign an owner.

- State the objective, hypothesis, variables, controls, fixtures, and stopping rules.

- Add prerequisites and create local workback tasks from the target run date.

- Freeze or revise the protocol before recording run results.

- Create one run record per attempt and link the applicable protocol revision and fixture.

- Record deviations and failures separately from observations; do not overwrite prior run history.

- Link source-labelled files and receipts without implying upload or protected-storage completion.

- Run bounded calculations and record inputs, outputs, assumptions, and instrument status.

- Draft an interpretation with uncertainty and competing explanations.

- Send the project to local review; preserve approval or held state and revision history.

## Scheduling records

- milestone to-dos

- deadline and workback records

- dependency records

- owner assignments

- NotebookTodo records for deadlines and workback steps

## Sources and evidence

These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.

- `source_record:project:experiment-run`

- `NotebookCollectionKind.project`

- `NotebookTodoPayload.dueAt`

- `Notebook Agenda deadlines/workbacks`

- `Notebook records provenance and revisions`

- `PointGuard persistent cross-app context surface`

- `/app/notebook/projects/`

- `/app/notebook/to-dos/`

- `/app/notebook/agenda/`

- `/app/notebook/approvals/`

- `/app/notebook/files/`

- `/app/notebook/capture/`

- `/app/notebook/agent-logs/`

- `APP_ROUTES /app/notebook/projects/`

- `APP_ROUTES /app/notebook/agenda/`

- `APP_ROUTES /app/notebook/approvals/`

- `APP_ROUTES /app/pointguard/`

- `ALLOWED_INSTRUMENTS:scientific-calculator`

- `ALLOWED_INSTRUMENTS:statistics-suite-descriptive-stats`

- `ALLOWED_INSTRUMENTS:date-duration-calculator`
