Source: https://guthlabs.ai/docs/project-templates/experiment-run/forms/

project template / candidate

# Experiment run — forms

The distinct forms record for Experiment run. This page is proposal-only.

Status: **proposed**Lifecycle: **candidate**

## Record status

**Record ID**: project:experiment-run

**Parent lifecycle**: candidate

**Page lane**: forms

**Lane lifecycle**: proposed

**Owner**: Not separately recorded

**Owner role**: Not separately recorded

**Owner status**: Not separately recorded

**Qualification result**: NOT RUN · held for evidence and human review

**Working browser surface:** [Project templates & workflows — overview](<https://guthlabs.ai/labs.html#templates-workflows>) — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.

## Proposed form sections

Each section is a candidate schema for inspectable records. Required-field presence does not establish factual truth.

### Intake

Capture the experiment request, intended decision, and accountable people before planning begins.

- experiment name

- requestor

- date submitted

- business or research question

- decision this experiment should inform

- hypothesis or expected relationship

- success definition

- out-of-scope questions

- priority

- confidentiality or visibility level

- intake reviewer

- intake review due date

### Scope and protocol

Define what will be tested and the bounded protocol that operators must follow.

- objective

- independent variables

- dependent variables

- controlled variables

- control groups or baseline

- sample or input definition

- sample size or run count

- inclusion criteria

- exclusion criteria

- measurement method

- units and precision

- protocol steps

- stop conditions

- safety or handling notes

- known limitations

- protocol version

- protocol owner

- protocol review status

### Milestones

Break the work into reviewable stages with owners, outputs, and dates.

- milestone name

- milestone purpose

- milestone owner

- planned start

- planned finish

- required output

- acceptance condition

- status

- completion date

- completion evidence link

- blocked reason

### Deadlines and workback

Create explicit due items and calculate the sequence backward from the decision deadline.

- decision deadline

- final evidence deadline

- interpretation review deadline

- last allowable run date

- setup readiness deadline

- protocol approval deadline

- intake completion deadline

- workback anchor

- calendar assumptions

- buffer days

- owner for each deadline

- priority

- recurrence candidate

- completion state

- revision note

### Dependencies

Record prerequisites and external or internal blockers without implying that held integrations are connected.

- dependency name

- dependency type

- description

- required-by milestone

- dependency owner

- status

- due date

- evidence of readiness

- failure impact

- fallback or workaround

- escalation owner

- external system or provider name if applicable

- connection state: not verified, held, or verified by supplied record

### Owners and responsibilities

Make accountability explicit for every material activity and approval.

- role

- person or team

- responsibility

- decision authority

- backup owner

- availability window

- handoff condition

- acknowledgement state

- assignment date

- assignment evidence

### Fixtures and setup

Define the physical, software, or procedural setup required for each run.

- fixture or setup name

- version or identifier

- configuration

- location or custody note

- calibration or readiness state

- setup owner

- setup checklist

- required files or references

- pre-run inspection result

- inspection date

- inspection reviewer

- known setup limitations

### Run plan and run records

Plan individual runs and preserve observed outcomes, inputs, and operator receipts.

- run identifier

- planned date

- actual start

- actual end

- operator

- protocol version used

- control or treatment label

- input identifiers

- fixture identifier

- environmental conditions

- planned measurements

- observed measurements

- raw evidence reference

- run status: planned, ready, completed, failed, invalidated, or held

- operator notes

- reviewer disposition

### Failures and deviations

Capture anything that invalidates, changes, or limits interpretation of a run.

- failure or deviation identifier

- related run

- detected date

- detected by

- description

- expected condition

- observed condition

- severity

- immediate containment

- impact on validity

- rerun required

- corrective action owner

- corrective action due date

- resolution evidence

- review disposition

### Evidence and receipts

Link source-labelled notes, files, captures, calculations, and review receipts to claims.

- evidence identifier

- evidence type

- claim or result supported

- source record or locator

- file reference if applicable

- capture date

- created by

- source SHA-256 if available

- provenance note

- revision

- visibility

- review status

- reviewer

- review date

- limitations or missing context

### Interpretation

Separate observations, calculations, interpretations, and unsupported conclusions.

- analysis question

- dataset or run set

- calculation method

- assumptions

- observed result

- uncertainty or variability note

- interpretation

- alternative explanations

- unsupported claims explicitly held

- recommendation

- analyst

- analysis revision

- review due date

### Approvals

Require human review for protocol changes, run validity, interpretation, and closure.

- approval type

- item under review

- proposed decision

- reviewer

- review deadline

- status: needs review, approved, or held

- conditions

- decision date

- receipt or rationale

- reopen trigger

### Risks

Track threats to safety, validity, schedule, custody, accessibility, and interpretation.

- risk identifier

- risk statement

- category

- likelihood

- impact

- risk owner

- mitigation

- contingency

- trigger

- review date

- residual risk

- status

- escalation path

### Closure

Confirm that the experiment is complete, bounded, reviewable, and not overstated.

- closure decision

- completion status

- all required runs dispositioned

- failed or invalid runs dispositioned

- evidence completeness check

- interpretation approved

- open risks

- unresolved dependencies

- lessons learned

- follow-up project or to-do

- retention or custody note

- closure owner

- closure date

- closure receipt

- public claims allowed

- public claims held

### Accessible state contract

- Every field requires a visible and programmatic label.

- Required and optional fields must be stated in text.

- Invalid entries require an actionable message linked to the field.

- Blocked and Held states remain visible without relying on color alone.

## Supporting documentation fields

These fields come from the app_features lane and remain separate from the primary operating form.

### Run identity

Name and scope the experiment without implying approval or execution.

- title

- objective

- owner

- reviewer

- status

- tags

- visibility

- source references

### Protocol and controls

Capture the planned method, variables, controls, fixtures, prerequisites, and stopping rules.

- protocol summary

- hypothesis

- independent variables

- dependent variables

- controlled variables

- control groups

- fixture IDs

- materials or inputs

- prerequisites

- safety notes

- exclusion criteria

- stopping rules

### Deadlines and workback

Turn the intended run date into explicit local tasks and review gates.

- target run date

- protocol freeze deadline

- fixture readiness deadline

- materials readiness deadline

- review deadline

- analysis deadline

- receipt deadline

- timezone

- task priority

- task recurrence candidate

- task tags

### Run log

Record each planned or completed run with reproducible inputs and observed state.

- run ID

- planned or actual start

- planned or actual end

- operator

- protocol revision

- fixture ID

- input values

- environment notes

- observations

- completion state

- deviation flag

- linked files

### Failures and deviations

Separate failed runs, protocol deviations, and unknown causes from successful observations.

- failure ID

- run ID

- failure type

- observed symptom

- timestamp

- suspected cause

- evidence links

- containment action

- retest decision

- review state

### Interpretation

Capture analysis, uncertainty, competing explanations, and a bounded conclusion.

- analysis question

- calculation inputs

- summary statistics

- uncertainty notes

- alternative explanations

- interpretation

- confidence label

- reviewer comments

- decision state

### Receipts and evidence

Preserve provenance and review history for every material claim.

- receipt type

- claim or decision

- source locator

- source SHA-256

- record origin

- linked records

- attachment reference

- revision

- reviewer

- approval state

- notes

## Required or proposed record references

No record existence is asserted by this documentation page.

- project record

- protocol note

- scope decision record

- milestone to-dos

- deadline and workback records

- dependency records

- owner assignments

- fixture or setup record

- run records

- failure and deviation records

- evidence records

- interpretation note

- approval records

- risk register

- closure receipt

- protocol record

- control record

- fixture record

- run record

- failure record

- interpretation record

- receipt record

- NotebookTodo records for deadlines and workback steps

## Sources and evidence

These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.

- `source_record:project:experiment-run`

- `NotebookCollectionKind.project`

- `NotebookTodoPayload.dueAt`

- `Notebook Agenda deadlines/workbacks`

- `Notebook records provenance and revisions`

- `PointGuard persistent cross-app context surface`

- `/app/notebook/projects/`

- `/app/notebook/to-dos/`

- `/app/notebook/agenda/`

- `/app/notebook/approvals/`

- `/app/notebook/files/`

- `/app/notebook/capture/`

- `/app/notebook/agent-logs/`

- `APP_ROUTES /app/notebook/projects/`

- `APP_ROUTES /app/notebook/agenda/`

- `APP_ROUTES /app/notebook/approvals/`

- `APP_ROUTES /app/pointguard/`

- `ALLOWED_INSTRUMENTS:scientific-calculator`

- `ALLOWED_INSTRUMENTS:statistics-suite-descriptive-stats`

- `ALLOWED_INSTRUMENTS:date-duration-calculator`
