Source: https://guthlabs.ai/docs/project-templates/field-guide-build/deadlines/

project template / candidate

# Field guide build — deadlines

The distinct deadlines record for Field guide build. This page is proposal-only.

Status: **proposed**Lifecycle: **candidate**

## Record status

**Record ID**: project:field-guide-build

**Parent lifecycle**: candidate

**Page lane**: app_features

**Lane lifecycle**: proposed

**Owner**: Not separately recorded

**Owner role**: Not separately recorded

**Owner status**: Not separately recorded

**Qualification result**: NOT RUN · held for evidence and human review

**Working browser surface:** [Project templates & workflows — overview](<https://guthlabs.ai/labs.html#templates-workflows>) — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.

## Deadline and workback rules

- A final deadline is required before the project can leave intake.

- Every milestone must have an owner, planned finish date, acceptance criteria, and review status.

- Workback dates must include a separate evidence-review window and approval window before the final deadline.

- A milestone cannot be marked complete without linked evidence or an explicit accepted exception.

- If a dependency is blocking and its required-by date passes, the affected milestone becomes At risk and requires owner review.

- Any changed deadline requires a reason, revised workback, revision owner, and approval if the final deadline changes.

- Dates must include a time zone; ambiguous or invalid dates block submission.

- Overdue items remain visible in Today, To-dos, and Agenda views; no hidden automation or external calendar write is assumed.

- Closure is blocked while required approvals are Needs review, required evidence is missing, or open blocking risks lack disposition.

- Target dates require an explicit date and timezone label; absent dates remain unscheduled.

- A milestone dueAt cannot be earlier than its dependency dueAt unless the user confirms an exception note.

- Generate workback tasks by subtracting declared duration and buffer from the milestone dueAt; do not infer durations.

- Flag overdue, due today, due soon, blocked, and conflict states with text labels in addition to color.

- Completed tasks retain completion time, actor label, revision, and prior dueAt.

- Recurrence is only a candidate until a human confirms it; no automatic recurring external action is created.

- Changing a milestone recalculates only local draft workback items and shows a change summary before save.

- Agenda provider synchronization and external calendar writes remain held.

## Workback sequence

- Create a local project record with canonical ID, origin, provenance, lifecycle, and source references.

- Define the field guide scope, audience, prerequisites, exclusions, and uncertainty notes.

- Attach source-labelled notes and file references; preserve locators, hashes, revisions, and custody state.

- Add bounded guide steps and link each step to its supporting record or instrument reference.

- Set the target review date and generate a workback from milestone duration, dependencies, and buffer days.

- Review the workback in Projects, To-dos, and Agenda; show conflicts and overdue items without writing to an external provider.

- Run designated educational instruments with explicit assumptions and save outputs as local receipts.

- Open the project in PointGuard to show current step, next deadline, open loops, review state, and linked records.

- Submit the guide for local approval; preserve Needs review, Approved, or Held state and reviewer receipt.

- Revise the guide after feedback, increment the revision, and retain prior versions.

- Show all unsupported publication, provider, credential, database, customer, and qualification effects as held.

## Scheduling records

- milestone to-dos

- deadline and workback entries

- dependency records

- agenda workback blocks

## Sources and evidence

These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.

- `source_record:project:field-guide-build`

- `project:field-guide-build`

- `NotebookCollectionKind.project`

- `NotebookTodoPayload.dueAt`

- `Notebook records preserve canonical IDs, origin, source locators, source SHA-256, provenance, revision, lifecycle, tags, links, attachments, and record revisions.`

- `Notebook Agenda deadlines/workbacks`

- `/app/notebook/projects/`

- `/app/notebook/field-guides/`

- `/app/notebook/to-dos/`

- `/app/notebook/agenda/`

- `/app/notebook/files/`

- `/app/notebook/approvals/`

- `Notebook records canonical IDs, provenance, source locators, source SHA-256, revisions, lifecycle, tags, links, and attachments`

- `PointGuard persistent cross-app context surface`

- `APP_ROUTES:/app/notebook/projects/`

- `APP_ROUTES:/app/notebook/field-guides/`

- `APP_ROUTES:/app/notebook/to-dos/`

- `APP_ROUTES:/app/notebook/agenda/`

- `APP_ROUTES:/app/notebook/approvals/`

- `APP_ROUTES:/app/pointguard/`

- `ALLOWED_INSTRUMENTS:date-duration-calculator`

- `ALLOWED_INSTRUMENTS:countdown-days-until-timer`
