# Field guide build — forms

The distinct forms record for Field guide build. This page is proposal-only.

Status: **proposed**Lifecycle: **candidate**

## Record status

**Record ID**: project:field-guide-build

**Parent lifecycle**: candidate

**Page lane**: forms

**Lane lifecycle**: proposed

**Owner**: Not separately recorded

**Owner role**: Not separately recorded

**Owner status**: Not separately recorded

**Qualification result**: NOT RUN · held for evidence and human review

**Working browser surface:** [Project templates & workflows — overview](<https://guthlabs.ai/labs.html#templates-workflows>) — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.

## Proposed form sections

Each section is a candidate schema for inspectable records. Required-field presence does not establish factual truth.

### Intake

Establish why the guide is needed, who requested it, and what source-bound outcome is proposed.

- project title

- requestor

- project owner

- guide author

- business or operational problem

- intended outcome

- target audience

- request date

- requested completion date

- priority

- source record IDs

- source locators

- source SHA-256 values when available

- known constraints

- accessibility requirements

- privacy or visibility classification

### Scope and boundaries

Define what the guide will and will not cover before work begins.

- in-scope procedures

- out-of-scope procedures

- assumptions

- prerequisites

- required inputs

- expected outputs

- supported lifecycle states

- failure and stop conditions

- human-review points

- provider or external-effect boundaries

- success measures

- change-control rule

### Owners and responsibilities

Assign accountable human roles for every major decision and deliverable.

- project owner

- guide author

- source verifier

- procedure tester

- evidence owner

- risk owner

- approver

- closure owner

- backup owner

- role responsibilities

- handoff conditions

- escalation contact

### Milestones and deliverables

Turn the guide build into ordered, reviewable work.

- milestone ID

- milestone title

- deliverable

- owner

- planned start

- planned finish

- acceptance criteria

- preceding milestone IDs

- status

- completion evidence record IDs

- review gate

- rework rule

### Deadlines and workback

Create explicit due dates and derive a reviewable workback schedule.

- final deadline

- deadline type

- time zone

- hard or soft deadline

- buffer days

- milestone due dates

- review windows

- approval deadline

- publication or export hold state

- date-change reason

- revised deadline

- revision owner

### Dependencies

Capture conditions that can block or delay the project.

- dependency ID

- dependency description

- dependent milestone

- dependency owner

- required-by date

- dependency type

- status

- verification method

- fallback plan

- blocking severity

- escalation date

### Tools and guides

Declare which native surfaces and procedures are proposed for each activity without implying connected production behavior.

- activity

- designated native surface

- tool or guide name

- purpose

- record owner

- authority boundary

- local prototype or indexed state

- manual action required

- fallback surface

- known limitation

### Evidence and receipts

Preserve source-bound proof for claims, tests, decisions, and completion.

- evidence ID

- claim or requirement supported

- evidence type

- source record ID

- source locator

- source SHA-256

- attachment or file reference ID

- test performed

- test result

- captured by

- captured at

- provenance note

- visibility

- review status

### Approvals

Make review decisions explicit and preserve the decision receipt.

- approval ID

- decision requested

- reviewer

- review scope

- required evidence

- decision status

- decision date

- conditions

- rejection reason

- rework owner

- next review date

- receipt or revision ID

### Risks and failure states

Identify foreseeable failure modes and define responses before execution.

- risk ID

- risk statement

- affected scope

- likelihood

- impact

- severity

- trigger

- owner

- mitigation

- contingency

- stop condition

- escalation deadline

- current status

- residual risk acceptance

### Closure and maintenance

Confirm completion, record unresolved items, and define future maintenance.

- closure decision

- completion date

- final guide record ID

- accepted deliverables

- open items

- deferred items

- known limitations

- maintenance owner

- review cadence candidate

- next review date

- archive or retention instruction

- closure approver

- closure evidence IDs

### Accessible state contract

- Every field requires a visible and programmatic label.

- Required and optional fields must be stated in text.

- Invalid entries require an actionable message linked to the field.

- Blocked and Held states remain visible without relying on color alone.

## Supporting documentation fields

These fields come from the app_features lane and remain separate from the primary operating form.

### Project identity

Define the project and its source boundary.

- project title

- short purpose

- owner label

- source record IDs

- source locators

- source SHA-256 when available

- tags

- visibility label

### Guide scope

Describe what the field guide will cover without asserting production qualification.

- guide title

- intended audience

- operating context

- included procedures

- excluded procedures

- required prerequisites

- known uncertainty notes

### Deadlines and workback

Create explicit milestones and derived local tasks.

- target review date

- target maintenance date

- milestone name

- milestone dueAt

- priority

- task duration estimate

- dependency record IDs

- buffer days

- recurrence candidate

- timezone label

### Evidence and instruments

Attach source-labelled evidence and verified instruments to bounded steps.

- linked note IDs

- linked file reference IDs

- instrument slug

- instrument use

- input assumptions

- result receipt

- review status

### Review and handoff

Capture human review before a guide is treated as ready for local use.

- reviewer label

- review decision

- review notes

- open hazards

- approval record ID

- revision summary

- held external effects

## Required or proposed record references

No record existence is asserted by this documentation page.

- project record

- field guide record

- source-labelled notes

- source-labelled file references

- milestone to-dos

- deadline and workback entries

- dependency records

- evidence receipts

- approval record

- risk records

- closure record

- project record owned by Notebook Projects

- field guide record owned by Notebook Field Guides

- instrument or procedure references

- to-dos with dueAt, priority, tags, and completion state

- agenda workback blocks

- revision and provenance receipts

## Sources and evidence

These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.

- `source_record:project:field-guide-build`

- `project:field-guide-build`

- `NotebookCollectionKind.project`

- `NotebookTodoPayload.dueAt`

- `Notebook records preserve canonical IDs, origin, source locators, source SHA-256, provenance, revision, lifecycle, tags, links, attachments, and record revisions.`

- `Notebook Agenda deadlines/workbacks`

- `/app/notebook/projects/`

- `/app/notebook/field-guides/`

- `/app/notebook/to-dos/`

- `/app/notebook/agenda/`

- `/app/notebook/files/`

- `/app/notebook/approvals/`

- `Notebook records canonical IDs, provenance, source locators, source SHA-256, revisions, lifecycle, tags, links, and attachments`

- `PointGuard persistent cross-app context surface`

- `APP_ROUTES:/app/notebook/projects/`

- `APP_ROUTES:/app/notebook/field-guides/`

- `APP_ROUTES:/app/notebook/to-dos/`

- `APP_ROUTES:/app/notebook/agenda/`

- `APP_ROUTES:/app/notebook/approvals/`

- `APP_ROUTES:/app/pointguard/`

- `ALLOWED_INSTRUMENTS:date-duration-calculator`

- `ALLOWED_INSTRUMENTS:countdown-days-until-timer`