Source: https://guthlabs.ai/docs/project-templates/security-remediation/deadlines/

project template / candidate

# Security remediation — deadlines

The distinct deadlines record for Security remediation. This page is proposal-only.

Status: **proposed**Lifecycle: **candidate**

## Record status

**Record ID**: project:security-remediation

**Parent lifecycle**: candidate

**Page lane**: app_features

**Lane lifecycle**: proposed

**Owner**: Not separately recorded

**Owner role**: Not separately recorded

**Owner status**: Not separately recorded

**Qualification result**: NOT RUN · held for evidence and human review

**Working browser surface:** [Project templates & workflows — overview](<https://guthlabs.ai/labs.html#templates-workflows>) — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.

## Deadline and workback rules

- A project cannot be accepted without a project owner, target completion date, severity, and scope status.

- Every milestone must have an owner, due date, entry criteria, output, and evidence requirement.

- Workback dates must be visibly derived from the target completion date and preserve timezone and revision history.

- A missed deadline changes the item to overdue or blocked and requires an owner note; it does not silently reschedule work.

- Any scope change requires a new scope revision and approval before dependent work proceeds.

- Validation and closure deadlines cannot be marked complete without linked evidence and reviewer disposition.

- Uncertain or missing dates remain explicitly unknown rather than being inferred.

- External provider writes, credential use, database changes, customer effects, publication, and production effects remain held unless separately verified and approved.

- A project must have an owner and reviewer before remediation to-dos are marked ready.

- Every remediation step must have a due date or an explicit reason it is undated.

- The final validation deadline must precede any proposed external effect deadline.

- If a dependency is overdue, downstream steps show blocked rather than silently moving dates.

- Agenda changes are drafts only and require human review before any external calendar write.

- Recurring deadlines are proposals only and require confirmation before activation.

- Overdue items remain visible in Today and the project workback until completed, rescheduled, or held.

## Workback sequence

- Create the project and assign a human owner and reviewer.

- Write the bounded issue statement and record explicit in-scope and out-of-scope actions.

- Attach source-labelled notes and file references; preserve locators, provenance, revisions, and available hashes.

- Create a containment or investigation workback with dependencies and human-owned deadlines.

- Investigate using linked evidence without changing external systems or widening authority.

- Draft the remediation change as a local proposal and record rollback or containment considerations.

- Run local validation checks and record expected versus observed results.

- Open an approval record for reviewer disposition: Needs review, Approved, or Held.

- Update the project status and receipts; keep any provider, credential, database, customer, publication, or production action held.

## Scheduling records

- milestone records

- deadline and workback to-dos

- dependency records

- owner assignments

- deadline and workback records

## Sources and evidence

These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.

- `source_record:project:security-remediation`

- `NotebookCollectionKind.project`

- `NotebookTodoPayload.dueAt`

- `Notebook Agenda deadlines/workbacks`

- `Observed native contract: records preserve canonical IDs, provenance, revisions, lifecycle, tags, links, attachments, and record revisions`

- `Observed native contract: PointGuard is a persistent cross-app context surface; specialist apps remain execution and canonical-record owners`

- `Observed native contract: provider, credential, database, customer, publication, and production effects are held`

- `/app/notebook/projects/`

- `/app/notebook/to-dos/`

- `/app/notebook/agenda/`

- `/app/notebook/approvals/`

- `/app/notebook/files/`

- `/app/notebook/field-guides/`

- `/app/notebook/agent-logs/`

- `/app/pointguard/`

- `Notebook records provenance and revision contract`

- `PointGuard persistent cross-app context surface`

- `Current GuthHub app routes and held web boundary`

- `ALLOWED_INSTRUMENTS: checksum-verifier`
