Source: https://guthlabs.ai/docs/project-templates/website-surface/deadlines/

project template / candidate

# Website surface — deadlines

The distinct deadlines record for Website surface. This page is proposal-only.

Status: **proposed**Lifecycle: **candidate**

## Record status

**Record ID**: project:website-surface

**Parent lifecycle**: candidate

**Page lane**: app_features

**Lane lifecycle**: proposed

**Owner**: Not separately recorded

**Owner role**: Not separately recorded

**Owner status**: Not separately recorded

**Qualification result**: NOT RUN · held for evidence and human review

**Working browser surface:** [Project templates & workflows — overview](<https://guthlabs.ai/labs.html#templates-workflows>) — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.

## Deadline and workback rules

- A target release date is required before a release workback can be approved.

- Every milestone must have an owner, planned finish date, acceptance criteria, and evidence requirement.

- Every deadline must identify an owner and a late action; overdue items remain visible until resolved or explicitly rescheduled.

- Review deadlines must precede the release gate by enough time for documented remediation; the exact buffer is a project field, not an inferred system default.

- A blocked dependency automatically holds dependent milestones and release approval until an owner records resolution or an approved exception.

- Claims without source-labelled evidence remain held and cannot be marked approved.

- Accessibility, crawl, claim, and release gates must each have a recorded decision; absence of a decision is Needs review.

- External provider writes, credential use, database authority, customer indexing, publication, and production effects remain held.

- Closure cannot mark the project complete while required approvals, evidence, or blocking risks remain unresolved.

- Every project must have one target review or release date before a workback can be generated.

- Every milestone must have a due date, owner, priority, and completion state.

- A milestone cannot be marked complete while required dependencies are incomplete.

- Accessibility remediation due dates must not be later than the target review date unless explicitly marked held.

- Overdue items appear in Today and remain visible until completed, rescheduled, or held with a reason.

- Agenda changes are drafts only; no calendar provider write, invitation, notification, or external scheduling effect occurs.

- Changing the target date preserves the prior workback revision and creates a new deterministic revision.

- Dates require an explicit timezone and invalid or ambiguous dates produce an inline error.

## Workback sequence

- Create the project record and assign a human owner.

- Define proposed pages, routes, audience, and local scope.

- Add source-labelled claim records; mark unsupported or uncertain claims as held.

- Draft page content in Paper and link each draft to its project, claims, and source notes.

- Add file references for local assets without hidden upload or protected-storage assumptions.

- Create crawl review items for every proposed navigational and external link.

- Run the local accessibility checklist and record test results, evidence, owners, and due dates.

- Use the WCAG contrast instrument for contrast checks and retain its result as a linked review record.

- Set the target review or release date and generate a workback of local milestones.

- Review deadlines, conflicts, overdue items, and incomplete gates in Today and Agenda.

- Submit the assembled proposal to Approvals; preserve approval, hold, or needs-review receipts.

- Show the final release summary as proposal-only, with publication, hosting, provider writes, indexing, and customer effects explicitly held.

## Scheduling records

- milestone records

- deadline to-dos

- dependency records

- owner assignments

- workback record

- workback milestones

## Sources and evidence

These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.

- `source_record:project:website-surface`

- `NotebookCollectionKind.project`

- `NotebookTodoPayload.dueAt`

- `Notebook Agenda deadlines/workbacks`

- `Observed native contract: project_and_field_guide_collections`

- `Observed native contract: deadlines`

- `Observed native contract: records`

- `Observed native contract: pointguard`

- `Observed native contract: web_boundary`

- `APP_ROUTES:/app/notebook/projects/`

- `APP_ROUTES:/app/notebook/to-dos/`

- `APP_ROUTES:/app/notebook/agenda/`

- `APP_ROUTES:/app/notebook/approvals/`

- `APP_ROUTES:/app/notebook/notes/`

- `APP_ROUTES:/app/notebook/files/`

- `APP_ROUTES:/app/notebook/field-guides/`

- `APP_ROUTES:/app/notebook/search/`

- `APP_ROUTES:/app/pointguard/`

- `project:website-surface`

- `Notebook records provenance and revision contract`

- `PointGuard persistent cross-app context surface`

- `APP_ROUTES:/app/notebook/paper/`

- `ALLOWED_INSTRUMENTS:wcag-contrast-ratio-checker`

- `ALLOWED_INSTRUMENTS:reading-time-estimator`
