Page actions
instrument implementation / implementation-contract
Extra-Payment Payoff Impact implementation
A source-bound implementation contract for Extra-Payment Payoff Impact; deployment and executable qualification remain separate.
Binding contract
This record describes what an executable surface must bind and validate. It does not claim that a public calculator, package, or production route is deployed.
- Record owner
- Guth Instruments
- Lifecycle
- verified-clean
- Evidence ID
- t3-020
- Effect
- Computation or source lookup only
Input and validation requirements
A payment equal to the periodic interest on the initial principal produces a zero denominator in the closed-form payoff calculation and an invariant balance, so the loan never pays off. The instrument must reject or explicitly report this undefined/no-payoff case. Sign conventions for extra_payment can also change a valid payoff into this no-payoff case.
Required corrections
No binding erratum is attached to this unique-name record. Implementers must still preserve the declared units, domain, and failure behavior.
Inspectable interface fixture
The sample below is evidence for interface and validation tests, not a production implementation.
{
"inputs": {
"principal": 1000,
"annual_rate": 0.12,
"term_months": null,
"scheduled_payment": 250,
"extra_payment": 100,
"frequency": "monthly",
"extra_mode": "per_period",
"start_date": "2025-01-01"
},
"expected_outputs": {
"new_payoff_date": "2025-04-01",
"original_payoff_date": "2025-06-01",
"interest_saved": 5.9927976,
"months_saved": 2
},
"working": "Monthly rate = 0.12 / 12 = 0.01. Original schedule: B1 = 1000*1.01 - 250 = 760; B2 = 760*1.01 - 250 = 517.6; B3 = 517.6*1.01 - 250 = 272.776; B4 = 272.776*1.01 - 250 = 25.50376; B5 = 25.50376*1.01 = 25.7587976, so the final original payment is 25.7587976 and original interest = 25.7587976. Accelerated payment = 250 + 100 = 350. B1 = 1000*1.01 - 350 = 660; B2 = 660*1.01 - 350 = 316.6; B3 = 316.6*1.01 = 319.766, so the final accelerated payment is 319.766 and accelerated interest = 2*350 + 319.766 - 1000 = 19.766. Interest saved = 25.7587976 - 19.766 = 5.9927976. Months saved = 5 - 3 = 2. The third payment is on 2025-04-01."
}Other records
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.jsonevidence-tranche3/tranche3-results.json