Page actions
instrument implementation / implementation-contract
Ground Track / Orbital Period vs Altitude implementation
A source-bound implementation contract for Ground Track / Orbital Period vs Altitude; deployment and executable qualification remain separate.
Binding contract
This record describes what an executable surface must bind and validate. It does not claim that a public calculator, package, or production route is deployed.
- Record owner
- Guth Instruments
- Lifecycle
- verified-clean
- Evidence ID
- t4-256
- Effect
- Computation or source lookup only
Input and validation requirements
A zero supplied period makes the orbits-per-day calculation undefined, and an unspecified altitude unit permits materially different outputs for the same numeric input.
Required corrections
No binding erratum is attached to this unique-name record. Implementers must still preserve the declared units, domain, and failure behavior.
Inspectable interface fixture
The sample below is evidence for interface and validation tests, not a production implementation.
{
"inputs": {
"altitude_km": 0,
"mu_km3_s2": 398600.4418,
"earth_radius_km": 6378.137
},
"expected_outputs": {
"period_s": 5069.34,
"orbits_per_day": 17.0436
},
"working": "a = Rₑ + h = 6378.137 + 0 = 6378.137 km. T = 2π√(a³/μ) = 2π√(6378.137³ / 398600.4418) ≈ 5069.34 s. Orbits/day = 86400 / 5069.34 ≈ 17.0436."
}Other records
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.jsonevidence-tranche4/tranche4-results.json