Page actions
instrument implementation / implementation-contract
Pregnancy Due Date Calculator implementation
A source-bound implementation contract for Pregnancy Due Date Calculator; deployment and executable qualification remain separate.
Binding contract
This record describes what an executable surface must bind and validate. It does not claim that a public calculator, package, or production route is deployed.
- Record owner
- Guth Instruments
- Lifecycle
- verified-clean
- Evidence ID
- t4-242
- Effect
- Computation or source lookup only
Input and validation requirements
An extreme but valid-at-the-input-boundary JavaScript Date produces a due date beyond the representable Date range and must be rejected or reported as undefined. Additionally, an unlabelled slash-formatted date yields materially different results under MM/DD versus DD/MM conventions.
Required corrections
No binding erratum is attached to this unique-name record. Implementers must still preserve the declared units, domain, and failure behavior.
Inspectable interface fixture
The sample below is evidence for interface and validation tests, not a production implementation.
{
"inputs": {
"dating_method": "LMP",
"last_menstrual_period": "2025-01-01",
"as_of_date": "2025-02-12"
},
"expected_outputs": {
"estimated_due_date": "2025-10-08",
"gestational_age": "6w0d",
"trimester": 1
},
"working": "Due date: 2025-01-01 + 280 days = 2025-10-08. Gestational age: 2025-02-12 - 2025-01-01 = 42 days. 42 / 7 = 6 weeks with 0 days remaining, so 6w0d. Since 6w0d is before 14w0d, trimester = 1."
}Other records
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.jsonevidence-tranche4/tranche4-results.json