Page actions
instrument implementation / implementation-contract
Short-Circuit Fault Current Estimator (simplified) implementation
A source-bound implementation contract for Short-Circuit Fault Current Estimator (simplified); deployment and executable qualification remain separate.
Binding contract
This record describes what an executable surface must bind and validate. It does not claim that a public calculator, package, or production route is deployed.
- Record owner
- Guth Instruments
- Lifecycle
- verified-clean
- Evidence ID
- t5-091
- Effect
- Computation or source lookup only
Input and validation requirements
A zero-percent-impedance input causes division by zero and must be rejected. The convention probe also exposes a large result discrepancy: 7216.87836487032 A for a three-phase 480 V line-to-line interpretation versus 12500 A for a single-phase interpretation.
Required corrections
No binding erratum is attached to this unique-name record. Implementers must still preserve the declared units, domain, and failure behavior.
Inspectable interface fixture
The sample below is evidence for interface and validation tests, not a production implementation.
{
"inputs": {
"transformer_kVA": 100,
"percent_impedance": 5,
"secondary_voltage_VLL_V": 480,
"added_cable_impedance_ohm_per_phase": 0
},
"expected_outputs": {
"rated_current_A": 120.28,
"transformer_impedance_ohm_per_phase": 0.1152,
"total_source_impedance_ohm_per_phase": 0.1152,
"available_symmetrical_fault_current_A": 2405.7
},
"working": "Zbase=480²/(100×1000)=230400/100000=2.304 ohm. Ztr=(5/100)×2.304=0.05×2.304=0.1152 ohm. Zsource=0.1152+0=0.1152 ohm. Irated=100000/(1.73205×480)=100000/831.384=120.28 A. Isc=480/(1.73205×0.1152)=480/0.199526=2405.7 A."
}Other records
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.jsonevidence-tranche5/tranche5-results.json