Page actions
instrument implementation / implementation-contract
Three-Phase Power Calculator implementation
A source-bound implementation contract for Three-Phase Power Calculator; deployment and executable qualification remain separate.
Status: VERIFIED_WITH_ERRATALifecycle: implementation-contract
Binding contract
This record describes what an executable surface must bind and validate. It does not claim that a public calculator, package, or production route is deployed.
- Record owner
- Guth Instruments
- Lifecycle
- verified-with-binding-errata
- Evidence ID
- t4-042
- Effect
- Computation or source lookup only
Input and validation requirements
- Division by √3 is safe, but any inverse calculation such as current=power/(voltage·PF) requires explicit zero-voltage and zero-PF handling.
- PF values outside [0,1] are invalid if PF is an unsigned magnitude; the implementation must reject them or define signed-PF semantics.
- PF=0 makes calculations that divide by PF undefined, even though direct P, Q, and S calculations remain valid.
- Q sign is indeterminate unless leading or lagging behavior is provided; silently assuming lagging would produce misleading results.
- Unbalanced loads, non-sinusoidal waveforms, phase-to-neutral versus line-to-line voltage confusion, and peak-versus-RMS inputs can produce incorrect results.
- Connection type must be validated before applying wye/delta voltage and current conversions.
Required corrections
[
{
"vector": 3,
"field": "S_VA, Q_var",
"wrong": 4782.860228,
"correct": 4780.4602,
"cause": "used √3≈1.7329 in S (her own Vph used the correct 1.73205)"
},
{
"vector": 4,
"field": "S_VA, Q_var",
"wrong": "S 3600, Q 2160",
"correct": "S 1800, Q 1080",
"cause": "S doubled; contradicts her own correct P=1440 at PF 0.8"
}
]Inspectable interface fixture
The sample below is evidence for interface and validation tests, not a production implementation.
{
"inputs": {
"connection": "wye",
"VL_V": 400,
"IL_A": 10,
"PF": 0.8,
"reactive_behavior": "lagging"
},
"expected_outputs": {
"VPh_V": 230.940108,
"IPh_A": 10,
"P_W": 5542.562585,
"Q_var": 4156.921939,
"S_VA": 6928.20323
},
"working": "VPh=VL/√3=400/1.732050807=230.940108 V. For wye, IPh=IL=10 A. P=√3·VL·IL·PF=1.732050807·400·10·0.8=5542.562585 W. S=√3·VL·IL=1.732050807·400·10=6928.20323 VA. |sinθ|=√(1−0.8²)=√0.36=0.6; lagging gives positive Q, so Q=S·0.6=6928.20323·0.6=4156.921939 var."
}Other records
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.jsonevidence-tranche4/tranche4-results.jsontranche errata record