Page actions
instrument implementation / implementation-contract
Tile & Flooring Calculator implementation
A source-bound implementation contract for Tile & Flooring Calculator; deployment and executable qualification remain separate.
Binding contract
This record describes what an executable surface must bind and validate. It does not claim that a public calculator, package, or production route is deployed.
- Record owner
- Guth Instruments
- Lifecycle
- verified-clean
- Evidence ID
- t4-007
- Effect
- Computation or source lookup only
Input and validation requirements
The specification permits a zero tile area that causes division by zero, does not define validation for zero room area, and provides no formula or required inputs for the grout estimate.
Required corrections
No binding erratum is attached to this unique-name record. Implementers must still preserve the declared units, domain, and failure behavior.
Inspectable interface fixture
The sample below is evidence for interface and validation tests, not a production implementation.
{
"inputs": {
"room_length_ft": 12,
"room_width_ft": 10,
"tile_length_in": 12,
"tile_width_in": 12,
"waste_percent": 10,
"layout": "straight",
"tiles_per_box": 10
},
"expected_outputs": {
"room_area_sq_ft": 120,
"tile_area_sq_ft": 1,
"tiles": 132,
"boxes": 14
},
"working": "1. Room area = 12 ft × 10 ft = 120 ft². 2. Tile area = 12 in × 12 in = 1 ft × 1 ft = 1 ft². 3. Waste-adjusted area = 120 × (1 + 10/100) = 120 × 1.10 = 132 ft². 4. Tiles = ceil(132 / 1) = ceil(132) = 132. 5. Boxes = ceil(132 / 10) = ceil(13.2) = 14."
}Other records
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.jsonevidence-tranche4/tranche4-results.json