Page actions
project template / candidate
Social campaign — deadlines
The distinct deadlines record for Social campaign. This page is proposal-only.
Status: proposedLifecycle: candidate
Record status
- Record ID
- project:social-campaign
- Parent lifecycle
- candidate
- Page lane
- app_features
- Lane lifecycle
- proposed
- Owner
- Not separately recorded
- Owner role
- Not separately recorded
- Owner status
- Not separately recorded
- Qualification result
- NOT RUN · held for evidence and human review
Working browser surface: Project templates & workflows — overview — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.
Deadline and workback rules
- Every hard deadline must include a timezone or an explicit timezone-unknown state.
- Every milestone must have an owner, dueAt, completion state, and linked deliverable.
- The workback must place final approval before any intended external send or publication activity and include a visible buffer.
- A missed or at-risk deadline must create a revision note, risk record, new owner action, and reforecasted dueAt; it must not silently move.
- A dependency needed by a milestone must have a needed-by date and fallback plan.
- Recurring work may use recurrenceCandidate only as a review signal; no hidden automation is authorized.
- No provider calendar write, external send, publication, customer indexing, or production effect is implied by an agenda, message, or approval record.
- Closure is blocked while required approvals, evidence, unresolved critical risks, or held external actions remain unrecorded.
- Campaign end date is required before workback generation.
- Every milestone requires an owner, due date, completion state, and dependency check.
- Review due dates must precede any planned publication window by a configurable human-entered buffer.
- Missing timezone, ambiguous date, or end date before start date blocks workback generation.
- Overdue incomplete milestones appear in Today and PointGuard as blockers.
- Conflicting agenda blocks are warnings until a human resolves them; no external calendar change is made.
- A draft cannot enter Approved while required accessibility, privacy, or claims checks are unresolved.
- Approval expires or returns to Needs review when the draft content, audience, channel, or publication window changes.
- Publication and final send remain held regardless of approval state.
Workback sequence
- Create the project and assign an owner.
- Complete the brief and record assumptions, audience, dates, and success measures.
- Add proposed channels and create one message draft per channel or variant.
- Add source-labelled asset references; keep upload and protected storage held.
- Generate milestones from the campaign end date using explicit offsets and review buffers.
- Review the agenda for deadline conflicts and draft schedule changes without external calendar writes.
- Run copy, link, privacy, and accessibility checks; show failures inline and preserve revisions.
- Submit drafts to local Approvals as Needs review.
- Record an Approved or Held decision with a receipt; approval never publishes or sends.
- Capture measurement snapshots manually or from verified local records and compare periods.
- Use PointGuard to inspect current work, blockers, approvals, and projection scenarios.
- Close the campaign only when required records, decisions, and receipts are present.
Scheduling records
- milestone and deadline records with dueAt, priority, completion state, tags, and revisions
- dependency and risk records
- owner and reviewer assignments
- workback schedule
- campaign milestone to-do
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
source_record:project:social-campaignproject:social-campaignNotebookCollectionKind.projectNotebookTodoPayload.dueAtNotebook records provenance and revision contractNotebook Agenda deadlines/workbacks/app/notebook/projects//app/notebook/to-dos//app/notebook/agenda//app/notebook/messages//app/notebook/approvals//app/notebook/paper//app/notebook/field-guides//app/pointguard/Notebook records provenance, source locators, SHA-256, revisions, lifecycle, tags, links, and attachmentsObserved web boundary: provider, credential, database, customer, publication, and production effects are held