Off-Grid Solar Designer

Load to panels to controller to battery bank.

Status: observedLifecycle: verified-workflow-definition

Goal

Load to panels to controller to battery bank.

Instrument chain

  1. 01
  2. 02
  3. 03
  4. 04
  5. 05
  6. 06
  7. 07

Handoffs and cross-checks

Daily Wh → array W → controller A (Isc×1.25) → bank Ah (DoD, autonomy) → pack S/P.

PointGuard stance

Voc cold-corrected must clear the controller limit with margin; equality is a FAIL (the t4-162 boundary convention).