Page actions
instrument / verified-with-binding-errata
Amortization Schedule
The current ledger marks this instrument verified with errata that must be applied at binding time.
Inspectable records
Ledger state
The current ledger marks this instrument verified with errata that must be applied at binding time.
- Area
- Finance, Economics & Business (educational only — never individualized investment, tax, or legal advice)
- Tranche
- tranche-3
- Evidence ID
- t3-008
- Ledger rows
- 1
No ledger note is attached.
Review findings
The core balance iteration is standard under clearly defined periodic-rate and payment conventions, but the specification omits the PMT formula, rate and term frequencies, extra-payment behavior, final-payment handling, rounding policy, and the data needed for a payoff date. One test vector exposed an arithmetic inconsistency in the initial extra-payment working; the corrected period balances are 659.98, 316.56, and 0.00.
Formula and scope findings
- The iterative formulas are standard only when r is the interest rate per payment period and PMT is the total payment applied in that period.
- PMT is referenced but no formula or input definition is provided. For a fully amortizing fixed-rate loan, the standard formula is PMT=P*r/(1-(1+r)^(-n)) when r is nonzero, and PMT=P/n when r=0.
- The treatment of the optional extra payment is undefined: it must specify whether extra-payment is added to PMT every period, applied only to principal, and whether the scheduled term is shortened.
- The final payment must be capped at the remaining balance plus that period's interest; otherwise the iterative formula can produce a negative balance or overpayment.
- The payoff date cannot be computed from principal, rate, term, and extra-payment alone; an origination date and payment-calendar convention are required.
Unit assumptions
- The test vectors use monthly payments and a monthly periodic rate unless explicitly noted.
- For annual nominal rates, the monthly rate is annual_rate/12; this assumes a nominal rate compounded monthly, not an effective annual rate.
- Term is measured in payment periods.
- Amounts are currency units rounded to the nearest cent after each period.
- PMT is computed using the fixed-payment annuity formula, and the final payment is adjusted downward to exactly clear the balance.
- No payoff date is expected in these vectors because no origination date or calendar convention is supplied.
Boundary hardening
BREAK_CLAIMED · SELF_FLAGGED
A term of zero makes the payment calculation divide by zero and must be rejected. The specification also omits payment frequency and rate convention, so identical-looking rate and term inputs can produce materially different schedules.
Errata and corrections
No applied erratum is attached to this unique-name record.
Inspectable example
4 review vectors are recorded. One source-bound sample is shown below.
{
"inputs": {
"principal": 1200,
"annual_rate": 0,
"payment_frequency": "monthly",
"term_periods": 3,
"extra_payment": 0,
"rounding": "nearest cent"
},
"expected_outputs": {
"table": [
{
"period": 1,
"interest": 0,
"principal": 400,
"balance": 800
},
{
"period": 2,
"interest": 0,
"principal": 400,
"balance": 400
},
{
"period": 3,
"interest": 0,
"principal": 400,
"balance": 0
}
],
"payoff_period": 3,
"payoff_date": null
},
"working": "Monthly rate r=0.00/12=0.00. PMT=P/n=1200.00/3=400.00. Period 1: interest=1200.00*0.00=0.00; principal=400.00-0.00=400.00; balance=1200.00-400.00=800.00. Period 2: interest=800.00*0.00=0.00; principal=400.00; balance=800.00-400.00=400.00. Period 3: interest=400.00*0.00=0.00; principal=400.00; balance=400.00-400.00=0.00."
}Related workflows
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.json · VERIFIED_WITH_ERRATAevidence-tranche3/tranche3-results.jsonBOUNDARY_HAZARD_CATALOG.json