Page actions
instrument / verified-clean
Fence Materials Calculator
The current ledger marks this instrument verified clean within the source-bound verification corpus.
Inspectable records
Ledger state
The current ledger marks this instrument verified clean within the source-bound verification corpus.
- Area
- Everyday & Life
- Tranche
- tranche-4
- Evidence ID
- t4-067
- Ledger rows
- 1
No ledger note is attached.
Review findings
The instrument is not ready for an honest production label. It currently supports only basic post and picket estimates under explicit straight-run and unit-consistency assumptions; rail, concrete, panel, and gate-aware outputs are unspecified.
Formula and scope findings
- The post formula is valid only for a straight, continuous fence run with posts at both ends and post_spacing treated as the maximum allowable spacing: ceil(total_length/post_spacing)+1.
- The picket formula is valid only when picket_width_spacing means the center-to-center coverage of one picket plus its gap. It does not account for endpoint conventions, gate openings, corners, or partial-width finishing pieces.
- gate_count is listed as an input but is unused. Gate openings should normally reduce panel/picket coverage, while gate structures may require additional posts.
- The specification promises rail/concrete estimates but provides no formulas for rail count, concrete volume, or concrete bag count.
- The specification claims panels/pickets, but no panel-count formula is provided and panel dimensions are not defined.
Unit assumptions
- total_length and post_spacing must use the same length unit before division.
- total_length and picket_width_spacing must use the same length unit before division; mixed units require explicit conversion.
- post_spacing is assumed to be a maximum spacing, not a nominal target that may be exceeded.
- picket_width_spacing is assumed to be picket width plus gap, measured as coverage per picket.
- The post formula assumes one post at each end and no separate treatment for gates, corners, or transitions.
Boundary hardening
BREAK_CLAIMED · SELF_FLAGGED
Zero post spacing or zero picket width-plus-gap produces undefined divisions, so the calculator must reject those inputs. The specification also lacks a formula for rail/concrete estimates and does not define how gate_count affects material counts.
Errata and corrections
No applied erratum is attached to this unique-name record.
Inspectable example
4 review vectors are recorded. One source-bound sample is shown below.
{
"inputs": {
"total_length": 120,
"post_spacing": 8,
"picket_width_spacing": 0.5,
"length_unit": "ft",
"gate_count": 1
},
"expected_outputs": {
"post_count": 16,
"picket_count": 240
},
"working": "Posts: 120 / 8 = 15; ceil(15) = 15; 15 + 1 = 16. Pickets: 120 / 0.5 = 240; ceil(240) = 240. gate_count is not used by the supplied formulas."
}Related workflows
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.json · VERIFIED_CLEANevidence-tranche4/tranche4-results.jsonBOUNDARY_HAZARD_CATALOG.json