Page actions
instrument / verified-clean
Hourly Rate / Freelance Pricing Calculator
The current ledger marks this instrument verified clean within the source-bound verification corpus.
Inspectable records
Ledger state
The current ledger marks this instrument verified clean within the source-bound verification corpus.
- Area
- Finance, Economics & Business (educational only — never individualized investment, tax, or legal advice)
- Tranche
- tranche-5
- Evidence ID
- t5-041
- Ledger rows
- 1
No ledger note is attached.
Review findings
The core hourly-rate formula is mathematically valid only when target_income plus overhead represents the required annual revenue and utilization_pct is converted from a percentage to a decimal. The specification needs an explicit tax-buffer formula or removal of that input, definitions for day and project rates, and validation and unit conventions before approval.
Formula and scope findings
- The tax buffer % input is not used in the hourly-rate formula. If target_income is a desired after-tax income, the formula needs an explicit tax-buffer convention, such as (target_income+overhead)/(1-tax_buffer_pct), subject to the intended interpretation.
- No formulas are provided for the declared day rate or project rate suggestion outputs, so those outputs cannot be verified or reproduced.
- The formula does not state whether target_income and overhead are annual amounts in the same currency and accounting basis.
Unit assumptions
- target_income and overhead are annual monetary amounts in the same currency.
- working_weeks is measured in weeks per year and hours_per_week is hours per working week.
- utilization_pct is entered as a percentage from 0 to 100 and converted to a decimal by dividing by 100.
- The hourly rate output is monetary units per billable hour.
- No tax adjustment is applied in the listed formula; tax_buffer_pct is ignored unless a revised formula defines how it is used.
- Day rate and project rate cannot be calculated without definitions for hours per day and project scope or estimated project hours.
Boundary hardening
BREAK_CLAIMED · SELF_FLAGGED
The zero-utilization case produces a division by zero and must be rejected. Additionally, tax_buffer_percent is an input without a defined role in the supplied formula, and project_rate_suggestion cannot be computed without project-duration inputs.
Errata and corrections
No applied erratum is attached to this unique-name record.
Inspectable example
4 review vectors are recorded. One source-bound sample is shown below.
{
"inputs": {
"target_income": 60000,
"overhead": 12000,
"working_weeks": 48,
"hours_per_week": 40,
"utilization_pct": 60,
"tax_buffer_pct": 25
},
"expected_outputs": {
"billable_hours": 1152,
"required_hourly_rate": 62.5,
"day_rate": null,
"project_rate_suggestion": null
},
"working": "billable_hours = 48 × 40 × (60 ÷ 100) = 48 × 40 × 0.60 = 1,152 hours.\\nrate = (60,000 + 12,000) ÷ 1,152 = 72,000 ÷ 1,152 = 62.50 per billable hour.\\ntax_buffer_pct = 25 is not used by the supplied formula. Day rate and project rate are undefined because no formulas are supplied."
}Related workflows
No source-defined multi-instrument workflow membership is recorded.
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
VERIFIED_LEDGER.json · VERIFIED_CLEANevidence-tranche5/tranche5-results.jsonBOUNDARY_HAZARD_CATALOG.json