Inrush Current / Fuse & Breaker Sizing Estimator implementation
A source-bound implementation contract for Inrush Current / Fuse & Breaker Sizing Estimator; deployment and executable qualification remain separate.
Binding contract
This record describes what an executable surface must bind and validate. It does not claim that a public calculator, package, or production route is deployed.
- Record owner
- Guth Instruments
- Lifecycle
- verified-clean
- Evidence ID
- t7-099
- Effect
- Computation or source lookup only
Input and validation requirements
The estimator has hazardous boundary behavior unless it validates inputs: zero current produces a meaningless zero rating, negative current can produce invalid negative ratings under a literal signed interpretation, and a very large transformer current causes the inrush calculation to overflow to infinity. The transformer multiplier is also only specified as a 10–15x range, so the selected table endpoint must be documented.
Required corrections
No binding erratum is attached to this unique-name record. Implementers must still preserve the declared units, domain, and failure behavior.
Inspectable interface fixture
The sample below is evidence for interface and validation tests, not a production implementation.
{
"inputs": {
"steady_current": 10,
"steady_current_unit": "A",
"load_type": "motor",
"safety_margin": 1
},
"expected_outputs": {
"recommended_rating_A": 12.5,
"inrush_current_estimate_A": 60
},
"reference_data": {
"continuous_current_factor": 1.25,
"continuous_current_factor_source_convention": "NEC-style rule of thumb; widely tabulated 125% sizing heuristic, not a universal NEC device-rating table entry",
"inrush_multiplier": 6,
"inrush_multiplier_source_convention": "widely tabulated standard engineering rule-of-thumb value for a typical across-the-line induction motor"
},
"working": "1. Continuous-current basis = 1.25 × 10.0 A = 12.5 A.\n2. Apply safety margin = 12.5 A × 1.00 = 12.5 A.\n3. Estimated inrush = 6.0 × 10.0 A = 60.0 A.\n4. Provisional outputs: recommended rating = 12.5 A; inrush estimate = 60.0 A."