Guth
NewsDocs
Page actions
View as Markdown ↗
Explore MCP tools ↗

project template / candidate

Experiment run — forms

The distinct forms record for Experiment run. This page is proposal-only.

Status: proposedLifecycle: candidate

Record status

Record ID
project:experiment-run
Parent lifecycle
candidate
Page lane
forms
Lane lifecycle
proposed
Owner
Not separately recorded
Owner role
Not separately recorded
Owner status
Not separately recorded
Qualification result
NOT RUN · held for evidence and human review

Working browser surface: Project templates & workflows — overview — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.

Proposed form sections

Each section is a candidate schema for inspectable records. Required-field presence does not establish factual truth.

Intake

Capture the experiment request, intended decision, and accountable people before planning begins.

  • experiment name
  • requestor
  • date submitted
  • business or research question
  • decision this experiment should inform
  • hypothesis or expected relationship
  • success definition
  • out-of-scope questions
  • priority
  • confidentiality or visibility level
  • intake reviewer
  • intake review due date

Scope and protocol

Define what will be tested and the bounded protocol that operators must follow.

  • objective
  • independent variables
  • dependent variables
  • controlled variables
  • control groups or baseline
  • sample or input definition
  • sample size or run count
  • inclusion criteria
  • exclusion criteria
  • measurement method
  • units and precision
  • protocol steps
  • stop conditions
  • safety or handling notes
  • known limitations
  • protocol version
  • protocol owner
  • protocol review status

Milestones

Break the work into reviewable stages with owners, outputs, and dates.

  • milestone name
  • milestone purpose
  • milestone owner
  • planned start
  • planned finish
  • required output
  • acceptance condition
  • status
  • completion date
  • completion evidence link
  • blocked reason

Deadlines and workback

Create explicit due items and calculate the sequence backward from the decision deadline.

  • decision deadline
  • final evidence deadline
  • interpretation review deadline
  • last allowable run date
  • setup readiness deadline
  • protocol approval deadline
  • intake completion deadline
  • workback anchor
  • calendar assumptions
  • buffer days
  • owner for each deadline
  • priority
  • recurrence candidate
  • completion state
  • revision note

Dependencies

Record prerequisites and external or internal blockers without implying that held integrations are connected.

  • dependency name
  • dependency type
  • description
  • required-by milestone
  • dependency owner
  • status
  • due date
  • evidence of readiness
  • failure impact
  • fallback or workaround
  • escalation owner
  • external system or provider name if applicable
  • connection state: not verified, held, or verified by supplied record

Owners and responsibilities

Make accountability explicit for every material activity and approval.

  • role
  • person or team
  • responsibility
  • decision authority
  • backup owner
  • availability window
  • handoff condition
  • acknowledgement state
  • assignment date
  • assignment evidence

Fixtures and setup

Define the physical, software, or procedural setup required for each run.

  • fixture or setup name
  • version or identifier
  • configuration
  • location or custody note
  • calibration or readiness state
  • setup owner
  • setup checklist
  • required files or references
  • pre-run inspection result
  • inspection date
  • inspection reviewer
  • known setup limitations

Run plan and run records

Plan individual runs and preserve observed outcomes, inputs, and operator receipts.

  • run identifier
  • planned date
  • actual start
  • actual end
  • operator
  • protocol version used
  • control or treatment label
  • input identifiers
  • fixture identifier
  • environmental conditions
  • planned measurements
  • observed measurements
  • raw evidence reference
  • run status: planned, ready, completed, failed, invalidated, or held
  • operator notes
  • reviewer disposition

Failures and deviations

Capture anything that invalidates, changes, or limits interpretation of a run.

  • failure or deviation identifier
  • related run
  • detected date
  • detected by
  • description
  • expected condition
  • observed condition
  • severity
  • immediate containment
  • impact on validity
  • rerun required
  • corrective action owner
  • corrective action due date
  • resolution evidence
  • review disposition

Evidence and receipts

Link source-labelled notes, files, captures, calculations, and review receipts to claims.

  • evidence identifier
  • evidence type
  • claim or result supported
  • source record or locator
  • file reference if applicable
  • capture date
  • created by
  • source SHA-256 if available
  • provenance note
  • revision
  • visibility
  • review status
  • reviewer
  • review date
  • limitations or missing context

Interpretation

Separate observations, calculations, interpretations, and unsupported conclusions.

  • analysis question
  • dataset or run set
  • calculation method
  • assumptions
  • observed result
  • uncertainty or variability note
  • interpretation
  • alternative explanations
  • unsupported claims explicitly held
  • recommendation
  • analyst
  • analysis revision
  • review due date

Approvals

Require human review for protocol changes, run validity, interpretation, and closure.

  • approval type
  • item under review
  • proposed decision
  • reviewer
  • review deadline
  • status: needs review, approved, or held
  • conditions
  • decision date
  • receipt or rationale
  • reopen trigger

Risks

Track threats to safety, validity, schedule, custody, accessibility, and interpretation.

  • risk identifier
  • risk statement
  • category
  • likelihood
  • impact
  • risk owner
  • mitigation
  • contingency
  • trigger
  • review date
  • residual risk
  • status
  • escalation path

Closure

Confirm that the experiment is complete, bounded, reviewable, and not overstated.

  • closure decision
  • completion status
  • all required runs dispositioned
  • failed or invalid runs dispositioned
  • evidence completeness check
  • interpretation approved
  • open risks
  • unresolved dependencies
  • lessons learned
  • follow-up project or to-do
  • retention or custody note
  • closure owner
  • closure date
  • closure receipt
  • public claims allowed
  • public claims held

Accessible state contract

  • Every field requires a visible and programmatic label.
  • Required and optional fields must be stated in text.
  • Invalid entries require an actionable message linked to the field.
  • Blocked and Held states remain visible without relying on color alone.

Supporting documentation fields

These fields come from the app_features lane and remain separate from the primary operating form.

Run identity

Name and scope the experiment without implying approval or execution.

  • title
  • objective
  • owner
  • reviewer
  • status
  • tags
  • visibility
  • source references

Protocol and controls

Capture the planned method, variables, controls, fixtures, prerequisites, and stopping rules.

  • protocol summary
  • hypothesis
  • independent variables
  • dependent variables
  • controlled variables
  • control groups
  • fixture IDs
  • materials or inputs
  • prerequisites
  • safety notes
  • exclusion criteria
  • stopping rules

Deadlines and workback

Turn the intended run date into explicit local tasks and review gates.

  • target run date
  • protocol freeze deadline
  • fixture readiness deadline
  • materials readiness deadline
  • review deadline
  • analysis deadline
  • receipt deadline
  • timezone
  • task priority
  • task recurrence candidate
  • task tags

Run log

Record each planned or completed run with reproducible inputs and observed state.

  • run ID
  • planned or actual start
  • planned or actual end
  • operator
  • protocol revision
  • fixture ID
  • input values
  • environment notes
  • observations
  • completion state
  • deviation flag
  • linked files

Failures and deviations

Separate failed runs, protocol deviations, and unknown causes from successful observations.

  • failure ID
  • run ID
  • failure type
  • observed symptom
  • timestamp
  • suspected cause
  • evidence links
  • containment action
  • retest decision
  • review state

Interpretation

Capture analysis, uncertainty, competing explanations, and a bounded conclusion.

  • analysis question
  • calculation inputs
  • summary statistics
  • uncertainty notes
  • alternative explanations
  • interpretation
  • confidence label
  • reviewer comments
  • decision state

Receipts and evidence

Preserve provenance and review history for every material claim.

  • receipt type
  • claim or decision
  • source locator
  • source SHA-256
  • record origin
  • linked records
  • attachment reference
  • revision
  • reviewer
  • approval state
  • notes

Required or proposed record references

No record existence is asserted by this documentation page.

  • project record
  • protocol note
  • scope decision record
  • milestone to-dos
  • deadline and workback records
  • dependency records
  • owner assignments
  • fixture or setup record
  • run records
  • failure and deviation records
  • evidence records
  • interpretation note
  • approval records
  • risk register
  • closure receipt
  • protocol record
  • control record
  • fixture record
  • run record
  • failure record
  • interpretation record
  • receipt record
  • NotebookTodo records for deadlines and workback steps

Sources and evidence

These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.

  • source_record:project:experiment-run
  • NotebookCollectionKind.project
  • NotebookTodoPayload.dueAt
  • Notebook Agenda deadlines/workbacks
  • Notebook records provenance and revisions
  • PointGuard persistent cross-app context surface
  • /app/notebook/projects/
  • /app/notebook/to-dos/
  • /app/notebook/agenda/
  • /app/notebook/approvals/
  • /app/notebook/files/
  • /app/notebook/capture/
  • /app/notebook/agent-logs/
  • APP_ROUTES /app/notebook/projects/
  • APP_ROUTES /app/notebook/agenda/
  • APP_ROUTES /app/notebook/approvals/
  • APP_ROUTES /app/pointguard/
  • ALLOWED_INSTRUMENTS:scientific-calculator
  • ALLOWED_INSTRUMENTS:statistics-suite-descriptive-stats
  • ALLOWED_INSTRUMENTS:date-duration-calculator