Field guide build — deadlines
The distinct deadlines record for Field guide build. This page is proposal-only.
Status: proposedLifecycle: candidate
Record status
- Record ID
- project:field-guide-build
- Parent lifecycle
- candidate
- Page lane
- app_features
- Lane lifecycle
- proposed
- Owner
- Not separately recorded
- Owner role
- Not separately recorded
- Owner status
- Not separately recorded
- Qualification result
- NOT RUN · held for evidence and human review
Working browser surface: Project templates & workflows — overview — Create a local project from this template and validate its forms. This route is local-only; provider, credential, database, customer, publication, deployment, and production effects remain held.
Deadline and workback rules
- A final deadline is required before the project can leave intake.
- Every milestone must have an owner, planned finish date, acceptance criteria, and review status.
- Workback dates must include a separate evidence-review window and approval window before the final deadline.
- A milestone cannot be marked complete without linked evidence or an explicit accepted exception.
- If a dependency is blocking and its required-by date passes, the affected milestone becomes At risk and requires owner review.
- Any changed deadline requires a reason, revised workback, revision owner, and approval if the final deadline changes.
- Dates must include a time zone; ambiguous or invalid dates block submission.
- Overdue items remain visible in Today, To-dos, and Agenda views; no hidden automation or external calendar write is assumed.
- Closure is blocked while required approvals are Needs review, required evidence is missing, or open blocking risks lack disposition.
- Target dates require an explicit date and timezone label; absent dates remain unscheduled.
- A milestone dueAt cannot be earlier than its dependency dueAt unless the user confirms an exception note.
- Generate workback tasks by subtracting declared duration and buffer from the milestone dueAt; do not infer durations.
- Flag overdue, due today, due soon, blocked, and conflict states with text labels in addition to color.
- Completed tasks retain completion time, actor label, revision, and prior dueAt.
- Recurrence is only a candidate until a human confirms it; no automatic recurring external action is created.
- Changing a milestone recalculates only local draft workback items and shows a change summary before save.
- Agenda provider synchronization and external calendar writes remain held.
Workback sequence
- Create a local project record with canonical ID, origin, provenance, lifecycle, and source references.
- Define the field guide scope, audience, prerequisites, exclusions, and uncertainty notes.
- Attach source-labelled notes and file references; preserve locators, hashes, revisions, and custody state.
- Add bounded guide steps and link each step to its supporting record or instrument reference.
- Set the target review date and generate a workback from milestone duration, dependencies, and buffer days.
- Review the workback in Projects, To-dos, and Agenda; show conflicts and overdue items without writing to an external provider.
- Run designated educational instruments with explicit assumptions and save outputs as local receipts.
- Open the project in PointGuard to show current step, next deadline, open loops, review state, and linked records.
- Submit the guide for local approval; preserve Needs review, Approved, or Held state and reviewer receipt.
- Revise the guide after feedback, increment the revision, and retain prior versions.
- Show all unsupported publication, provider, credential, database, customer, and qualification effects as held.
Scheduling records
- milestone to-dos
- deadline and workback entries
- dependency records
- agenda workback blocks
Sources and evidence
These pointers bind the page to evidence. They do not grant authority or collapse verification into deployment.
source_record:project:field-guide-buildproject:field-guide-buildNotebookCollectionKind.projectNotebookTodoPayload.dueAtNotebook records preserve canonical IDs, origin, source locators, source SHA-256, provenance, revision, lifecycle, tags, links, attachments, and record revisions.Notebook Agenda deadlines/workbacks/app/notebook/projects//app/notebook/field-guides//app/notebook/to-dos//app/notebook/agenda//app/notebook/files//app/notebook/approvals/Notebook records canonical IDs, provenance, source locators, source SHA-256, revisions, lifecycle, tags, links, and attachmentsPointGuard persistent cross-app context surfaceAPP_ROUTES:/app/notebook/projects/APP_ROUTES:/app/notebook/field-guides/APP_ROUTES:/app/notebook/to-dos/APP_ROUTES:/app/notebook/agenda/APP_ROUTES:/app/notebook/approvals/APP_ROUTES:/app/pointguard/ALLOWED_INSTRUMENTS:date-duration-calculatorALLOWED_INSTRUMENTS:countdown-days-until-timer